Via the seventies, water used in Lemon & Paeroa was made artificially instead of coming from the spring. To make certain that the synthetic water preferences the same as the original, checks had been designed between the synthetic and spring water. In July 1980 the manufacturing facility in Paeroa shut. L & P production shifted to Auckland, as well